Infobox:Automation 2 (research): Difference between revisions
Jump to navigation
Jump to search
(Updated cost-multiplier to 0.17.0. Updated expensive-cost-multiplier to 0.17.0. Updated cost to 0.17.0. Updated allows to 0.17.0. Updated required-technologies to 0.17.0.) |
(Updated allows to 0.17.3. Updated required-technologies to 0.17.3.) |
||
Line 7: | Line 7: | ||
|cost = Time, 15 + Automation science pack, 1 + Logistic science pack, 1 | |cost = Time, 15 + Automation science pack, 1 + Logistic science pack, 1 | ||
|cost-multiplier = 40 | |cost-multiplier = 40 | ||
|required-technologies = Electronics + Steel processing | |required-technologies = Electronics + Logistic science pack + Steel processing | ||
|allows = Concrete + Fluid handling | |allows = Concrete + Fluid handling + Lab research speed | ||
| effects = Assembling machine 2 | | effects = Assembling machine 2 | ||
| extra1 = Key technology for large scale production. | | extra1 = Key technology for large scale production. | ||
}}<noinclude>[[Category:Infobox page]]</noinclude> | }}<noinclude>[[Category:Infobox page]]</noinclude> |
Latest revision as of 11:34, 28 February 2019
Automation 2 |
Cost |
|
✖ 40 |
Cost |
|
✖ 160 |
Key technology for large scale production. |
|
Prototype type |
|
Internal name |
automation-2 |
Required technologies |
|
Allows |
|
Effects |
|