In other languages: Česky Deutsch Français 日本語 한국어 Nederlands Polska Português do Brasil Русский 中文

Green wire: Difference between revisions

From Official Factorio Wiki
Jump to navigation Jump to search
(clarification about wires + ghosts)
(Added History section and Factorio Origins: Green Wire)
Line 5: Line 5:


To form connections, entities capable of using a circuit network can be left clicked while holding the wire. This also works on [[Electric system#Distribution|electric pole]]s, so they can be used to connect the wire over longer distances. One unit of wire is needed for each connection between two points, unless a wire is included in a [[blueprint]]. Then, when the blueprint is filled out by [[construction robot]]s or by hand, no wire is consumed.
To form connections, entities capable of using a circuit network can be left clicked while holding the wire. This also works on [[Electric system#Distribution|electric pole]]s, so they can be used to connect the wire over longer distances. One unit of wire is needed for each connection between two points, unless a wire is included in a [[blueprint]]. Then, when the blueprint is filled out by [[construction robot]]s or by hand, no wire is consumed.
== History ==
{{history|0.1.0|
* Introduced}}


== See also ==
== See also ==

Revision as of 07:17, 16 September 2019

Green wire.png
Green wire

Green wire cable.png

Recipe

Time.png
0.5
+
Copper cable.png
1
+
Electronic circuit.png
1
Green wire.png
1

Total raw

Time.png
2
+
Copper plate.png
2
+
Iron plate.png
1

Recipe

Time.png
0.5
+
Copper cable.png
1
+
Electronic circuit.png
1
Green wire.png
1

Total raw

Time.png
3.25
+
Copper plate.png
4.5
+
Iron plate.png
2

Stack size

200

Prototype type

item

Internal name

green-wire

Required technologies

Circuit network (research).png

Produced by

Assembling machine 1.png
Assembling machine 2.png
Assembling machine 3.png
Player.png

Green wire is used to connect devices to a green circuit network.

To form connections, entities capable of using a circuit network can be left clicked while holding the wire. This also works on electric poles, so they can be used to connect the wire over longer distances. One unit of wire is needed for each connection between two points, unless a wire is included in a blueprint. Then, when the blueprint is filled out by construction robots or by hand, no wire is consumed.

History

See also