Infobox:Electric energy distribution 2 (research): Difference between revisions
Jump to navigation
Jump to search
(Updated cost to 0.15.11. Added expensive-cost-multiplier. Updated required-technologies to 0.15.11. Removed allows. Updated effects to 0.15.11.) |
(Added internal-name. Added prototype-type.) |
||
Line 1: | Line 1: | ||
{{Infobox | {{Infobox | ||
|prototype-type = technology | |||
|internal-name = electric-energy-distribution-2 | |||
|expensive-cost-multiplier = 400 | |expensive-cost-multiplier = 400 | ||
| category = Technology | | category = Technology |
Revision as of 19:27, 15 June 2017
Electric energy distribution 2 |
Cost |
|
✖ 100 |
Cost |
|
✖ 400 |
Prototype type |
|
Internal name |
electric-energy-distribution-2 |
Required technologies |
|
Effects |
|