Mining productivity (research): Difference between revisions
Jump to navigation
Jump to search
(Mining drill output table) |
m (capitalization fix) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 16: | Line 16: | ||
|} | |} | ||
== Output of | == Output of electric mining drills == | ||
[[File:Full belt miner.gif|thumb|right|At mining productivity 350, a single electric mining drill can fill a blue belt]] | |||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! | ! {{Icontech|Mining productivity (research)}} Mining productivity level !! Number of {{Imagelink|Speed module 3}} !! {{Imagelink|Express transport belt}} | ||
|- | |- | ||
| 80 || 3 || 0.25 | | 80 || 3 || 0.25 |
Latest revision as of 09:13, 17 August 2021
Mining productivity |
Cost |
|
✖ 250 |
Cost |
|
✖ 1000 |
Prototype type |
|
Internal name |
mining-productivity-1 |
Required technologies |
|
Allows |
|
Mining productivity is a research that increases the resource output of mining drills and pumpjacks by 10% per level. Unlike productivity from productivity modules, there are no downsides. Any ore that is produced by the productivity bonus is free, it does not deplete the resource under the miner.
Technology | Cost | Effects | Cumulative effect |
---|---|---|---|
Mining productivity 1 | ✖ 250 | 10% | 10% |
Mining productivity 2 | ✖ 500 | 10% | 20% |
Mining productivity 3 | ✖ 1000 | 10% | 30% |
Mining productivity 4-∞ | (eg. 2500 for level 4, 5000 for level 5) |
✖ 2500*(Level-3) 10% per level | 30% + 10%*(Level-3) |
Output of electric mining drills
Mining productivity level | Number of Speed module 3 | Express transport belt |
---|---|---|
80 | 3 | 0.25 |
170 | 3 | 0.5 |
215 | 0 | 0.25 |
350 | 3 | 1 |
440 | 0 | 0.5 |
890 | 0 | 1 |